Procuring Agency Details:
Name of Official Inviting RFP : Sherab Lodhen Designation : Procurement Officer
Official Address :
Address: Thimphu
City:
Gewog:
District: Thimphu -
Country: Bhutan
Contact details :
Phone No: 02-324217
Fax No:
Documents
 Amendment / Corrigendum No. :  2 
Amendment / Corrigendum Text : <p>Slight changes&nbsp;in the team compocsition &amp; evaluation criteria. Please refer the &quot;minimum&nbsp;requirement for the bidders&quot; in the TOR attached with the corrigendum notice.</p>
Field Name Old Value New Value

Criteria, sub-criteria and the points system for the evaluation of Technical Proposals are:

                                                                                                              Points

(i)     Specific experience of the Consultant relevant to the assignment:    [10]

  • The firm shall provide atleast two reference sites/institutions where they have undertaken similar assignments successfully. It should also have the contact persons, in the format prescribed in the Standard Request for EOI.

  • Provide evidence of having undertaken similar assignments in the last 5 years by submitting atleast two letters of reference.

(ii)    Adequacy of the proposed methodology and work plan in responding to the Terms of Reference:

a) Technical approach and methodology                                [20]

b) Work plan                                                                           [5]

 

                                                       Total points for criterion (ii):      [25]

(iii)   Key professional staff qualifications and competence for the assignment:

a)   Team Leader/Project Manager:                                                     [10]

b)   System Designer                                                                            [20]

c)   Nine System Developer (Front-end and Database)                      [30]

 

                                                      Total points for criterion (iii):      [60]

The number of points to be assigned to each of the above positions or disciplines shall be determined considering the following three sub-criteria and relevant percentage weights:

1)   General qualifications                     [20%]

2)   Adequacy for the assignment         [65]

3)   Experience in region and language [15]

                                                                                   Total weight:          100%

 

(iv)   Suitability of the transfer of knowledge (training) program: 

a) Training approach and methodology                                  [5]

 

                                                            Total points for criterion (iv):       [5]

 

(v)    Participation by nationals among proposed key staff                        [0 ]

 

 

                                                        Total points for the five criteria:             100

 

The minimum technical score St required to pass is: 70 Points 

Criteria, sub-criteria and the points system for the evaluation of Technical Proposals are:

                                                                                                              Points

(i)     Specific experience of the Consultant relevant to the assignment:    [10]

  • The firm shall provide atleast two reference sites/institutions where they have undertaken similar assignments successfully. It should also have the contact persons, in the format prescribed in the Standard Request for EOI.

  • Provide evidence of having undertaken similar assignments in the last 5 years by submitting atleast two letters of reference.

(ii)    Adequacy of the proposed methodology and work plan in responding to the Terms of Reference:

a) Technical approach and methodology                                [20]

b) Work plan                                                                           [5]

 

                                                       Total points for criterion (ii):      [25]

(iii)   Key professional staff qualifications and competence for the assignment:

a)   Team Leader/Project Manager:                                                     [20]

b)   System Architech                                                                            [10]

C) Business analyst                                                                                 [15]

d)   System Developer (Front-end and Database)                               [15]

 

                                                      Total points for criterion (iii):      [60]

The number of points to be assigned to each of the above positions or disciplines shall be determined considering the following three sub-criteria and relevant percentage weights:

1)   General qualifications                     [20%]

2)   Adequacy for the assignment         [65]

3)   Experience in region and language [15]

                                                                                   Total weight:          100%

 

(iv)   Suitability of the transfer of knowledge (training) program: 

a) Training approach and methodology                                  [5]

 

                                                            Total points for criterion (iv):       [5]

 

(v)    Participation by nationals among proposed key staff                        [0 ]

 

 

                                                        Total points for the five criteria:             100

 

The minimum technical score St required to pass is: 70 Points 

 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text : <p>Slight changes&nbsp;in the team compocsition &amp; evaluation criteria. Please refer the &quot;minimum&nbsp;requirement for the bidders&quot; in the TOR attached with the corrigendum notice.</p>
Field Name Old Value New Value
Closing Date & Time 28/07/2021 09:59 01/08/2021 09:59
Opening Date & Time 28/07/2021 10:59 01/08/2021 10:59
Amendment / Corrigendum/ Addendum No. : 1
Sl. No. File Name File Description File Size
(in KB)
1 corrigendum IBLS Project team.docx Changes in the Team composition. 15208