Name of Official Inviting RFP : | Sherab Lodhen | Designation : | Procurement Officer | ||||||||||||||
Official Address : |
|
Contact details : |
|
||||||||||||||
Documents |
Amendment / Corrigendum No. : 2
|
|
Amendment / Corrigendum Text : | <p>Slight changes in the team compocsition & evaluation criteria. Please refer the "minimum requirement for the bidders" in the TOR attached with the corrigendum notice.</p> |
Field Name | Old Value | New Value |
---|---|---|
Criteria, sub-criteria and the points system for the evaluation of Technical Proposals are: Points (i) Specific experience of the Consultant relevant to the assignment: [10]
(ii) Adequacy of the proposed methodology and work plan in responding to the Terms of Reference: a) Technical approach and methodology [20] b) Work plan [5]
Total points for criterion (ii): [25] (iii) Key professional staff qualifications and competence for the assignment: a) Team Leader/Project Manager: [10] b) System Designer [20] c) Nine System Developer (Front-end and Database) [30]
Total points for criterion (iii): [60] The number of points to be assigned to each of the above positions or disciplines shall be determined considering the following three sub-criteria and relevant percentage weights: 1) General qualifications [20%] 2) Adequacy for the assignment [65] 3) Experience in region and language [15] Total weight: 100%
(iv) Suitability of the transfer of knowledge (training) program: a) Training approach and methodology [5]
Total points for criterion (iv): [5]
(v) Participation by nationals among proposed key staff [0 ]
Total points for the five criteria: 100
The minimum technical score St required to pass is: 70 Points |
Criteria, sub-criteria and the points system for the evaluation of Technical Proposals are: Points (i) Specific experience of the Consultant relevant to the assignment: [10]
(ii) Adequacy of the proposed methodology and work plan in responding to the Terms of Reference: a) Technical approach and methodology [20] b) Work plan [5]
Total points for criterion (ii): [25] (iii) Key professional staff qualifications and competence for the assignment: a) Team Leader/Project Manager: [20] b) System Architech [10] C) Business analyst [15] d) System Developer (Front-end and Database) [15]
Total points for criterion (iii): [60] The number of points to be assigned to each of the above positions or disciplines shall be determined considering the following three sub-criteria and relevant percentage weights: 1) General qualifications [20%] 2) Adequacy for the assignment [65] 3) Experience in region and language [15] Total weight: 100%
(iv) Suitability of the transfer of knowledge (training) program: a) Training approach and methodology [5]
Total points for criterion (iv): [5]
(v) Participation by nationals among proposed key staff [0 ]
Total points for the five criteria: 100
The minimum technical score St required to pass is: 70 Points |
Amendment / Corrigendum No. : 1
|
|
Amendment / Corrigendum Text : | <p>Slight changes in the team compocsition & evaluation criteria. Please refer the "minimum requirement for the bidders" in the TOR attached with the corrigendum notice.</p> |
Field Name | Old Value | New Value |
---|---|---|
Closing Date & Time | 28/07/2021 09:59 | 01/08/2021 09:59 |
Opening Date & Time | 28/07/2021 10:59 | 01/08/2021 10:59 |
Amendment / Corrigendum/ Addendum No. : | 1 | ||||
Sl. No. | File Name | File Description | File Size (in KB) |
||
---|---|---|---|---|---|
1 | corrigendum IBLS Project team.docx | Changes in the Team composition. | 15208 |