Procuring Agency Details:
Name of Official Inviting RFP : Sherab Lodhen Designation : Procurement Officer
Official Address :
Address: Thimphu
City:
Gewog:
District: Thimphu -
Country: Bhutan
Contact details :
Phone No: 02-324217
Fax No:
The procuring Agency reserves the right to accept or reject all Tenders / Pre-Qualifications / EOIs
Note: Financial Institute will update the payment transactions only at the end of the day, so the bidders should make sure the securities and other payments are made at least one day before the submission date.
Documents
 Amendment / Corrigendum No. :  2 
Amendment / Corrigendum Text : <p>Slight changes&nbsp;in the team compocsition &amp; evaluation criteria. Please refer the &quot;minimum&nbsp;requirement for the bidders&quot; in the TOR attached with the corrigendum notice.</p>
Field Name Old Value New Value

Criteria, sub-criteria and the points system for the evaluation of Technical Proposals are:

                                                                                                              Points

(i)     Specific experience of the Consultant relevant to the assignment:    [10]

  • The firm shall provide atleast two reference sites/institutions where they have undertaken similar assignments successfully. It should also have the contact persons, in the format prescribed in the Standard Request for EOI.

  • Provide evidence of having undertaken similar assignments in the last 5 years by submitting atleast two letters of reference.

(ii)    Adequacy of the proposed methodology and work plan in responding to the Terms of Reference:

a) Technical approach and methodology                                [20]

b) Work plan                                                                           [5]

 

                                                       Total points for criterion (ii):      [25]

(iii)   Key professional staff qualifications and competence for the assignment:

a)   Team Leader/Project Manager:                                                     [10]

b)   System Designer                                                                            [20]

c)   Nine System Developer (Front-end and Database)                      [30]

 

                                                      Total points for criterion (iii):      [60]

The number of points to be assigned to each of the above positions or disciplines shall be determined considering the following three sub-criteria and relevant percentage weights:

1)   General qualifications                     [20%]

2)   Adequacy for the assignment         [65]

3)   Experience in region and language [15]

                                                                                   Total weight:          100%

 

(iv)   Suitability of the transfer of knowledge (training) program: 

a) Training approach and methodology                                  [5]

 

                                                            Total points for criterion (iv):       [5]

 

(v)    Participation by nationals among proposed key staff                        [0 ]

 

 

                                                        Total points for the five criteria:             100

 

The minimum technical score St required to pass is: 70 Points 

Criteria, sub-criteria and the points system for the evaluation of Technical Proposals are:

                                                                                                              Points

(i)     Specific experience of the Consultant relevant to the assignment:    [10]

  • The firm shall provide atleast two reference sites/institutions where they have undertaken similar assignments successfully. It should also have the contact persons, in the format prescribed in the Standard Request for EOI.

  • Provide evidence of having undertaken similar assignments in the last 5 years by submitting atleast two letters of reference.

(ii)    Adequacy of the proposed methodology and work plan in responding to the Terms of Reference:

a) Technical approach and methodology                                [20]

b) Work plan                                                                           [5]

 

                                                       Total points for criterion (ii):      [25]

(iii)   Key professional staff qualifications and competence for the assignment:

a)   Team Leader/Project Manager:                                                     [20]

b)   System Architech                                                                            [10]

C) Business analyst                                                                                 [15]

d)   System Developer (Front-end and Database)                               [15]

 

                                                      Total points for criterion (iii):      [60]

The number of points to be assigned to each of the above positions or disciplines shall be determined considering the following three sub-criteria and relevant percentage weights:

1)   General qualifications                     [20%]

2)   Adequacy for the assignment         [65]

3)   Experience in region and language [15]

                                                                                   Total weight:          100%

 

(iv)   Suitability of the transfer of knowledge (training) program: 

a) Training approach and methodology                                  [5]

 

                                                            Total points for criterion (iv):       [5]

 

(v)    Participation by nationals among proposed key staff                        [0 ]

 

 

                                                        Total points for the five criteria:             100

 

The minimum technical score St required to pass is: 70 Points 

 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text : <p>Slight changes&nbsp;in the team compocsition &amp; evaluation criteria. Please refer the &quot;minimum&nbsp;requirement for the bidders&quot; in the TOR attached with the corrigendum notice.</p>
Field Name Old Value New Value
Closing Date & Time 28/07/2021 09:59 01/08/2021 09:59
Opening Date & Time 28/07/2021 10:59 01/08/2021 10:59
Amendment / Corrigendum/ Addendum No. : 1
Sl. No. File Name File Description File Size
(in KB)
1 corrigendum IBLS Project team.docx Changes in the Team composition. 15208